May 12, 2004, Introduced by Reps. Milosch, Stahl, Palsrok, Voorhees, Amos, Taub, Meyer, LaJoy, Garfield, Nitz, DeRoche, Pumford, Hummel, Steil, Koetje, Bisbee, Hune, Tabor, Shaffer, DeRossett, Ehardt, Gaffney, Newell, Caswell, Walker, Moolenaar, Acciavatti, Kooiman, Huizenga, Hoogendyk, Caul, Nofs and Sheen and referred to the Committee on Commerce.
A bill to amend 1972 PA 230, entitled
"Stille-DeRossett-Hale single state construction code act,"
(MCL 125.1501 to 125.1531) by adding section 1510a.
THE PEOPLE OF THE STATE OF MICHIGAN ENACT:
1 Sec. 1510a. (1) Beginning the effective date of the
2 amendatory act that added this section and under circumstances
3 where the director is responsible for the enforcement and
4 administration of the code, the director shall issue a building
5 permit not later than 6 months after the applicant files a
6 completed application. If the application is considered
7 incomplete by the director, the director shall notify the
8 applicant in writing within 10 days after receipt of the
9 incomplete application, describing the deficiency and requesting
10 the additional information. The 6-month period is tolled upon
11 notification by the director of a deficiency until the date the
1 requested information is received by the director.
2 (2) If the director fails to issue or deny a building permit
3 within the time required by this section, the director shall
4 return the permit fee and shall reduce the permit fee for the
5 applicant's next renewal application, if any, by 15%. The
6 director shall not discriminate against an applicant in the
7 processing of the application based upon the fact that the
8 application fee was refunded or discounted under this
9 subsection.
10 (3) Beginning January 31, 2005, the director of the
11 commission shall submit a report by January 31 of each year to
12 the standing committees and appropriations subcommittees of the
13 senate and house of representatives concerned with construction
14 issues. The director shall include all of the following
15 information in the report concerning the preceding calendar
16 year:
17 (a) The number of initial and renewal applications the
18 director received and completed within the 6-month time period
19 described in subsection (1).
20 (b) The number of applications requiring a request for
21 additional information.
22 (c) The average time for an applicant to respond to a request
23 for additional information.
24 (d) The number of applications rejected, categorized by
25 reason for rejection.
26 (e) The amount of money returned to registrants under
27 subsection (2).
1 (f) The number of applications not issued within the 6-month
2 period.
3 (g) The average processing time for initial and renewal
4 applications.