HOUSE BILL No. 4293

 

February 27, 2003, Introduced by Reps. Hopgood, Murphy, Gieleghem, O'Neil, Law, Cheeks and Condino and referred to the Committee on Land Use and Environment.

        

                                                                                

                                                                                

                                                                                

                                                                                

                                                                                

                                                                                

                                                                                

                                                                                

                                                                                

                                                                                

                                                                                

                                                                                

                                                                                

                                                                                

                                                                                

                                                                                

                                                                                

                                                                                

                                                                                

                                                                                

                                                                                

                                                                                

                                                                                

                                                                                 A bill to amend 1994 PA 451, entitled                                             

                                                                                

    "Natural resources and environmental protection act,"                       

                                                                                

    by amending sections 11103, 11118, 11118a, 11120, 11123, and                

                                                                                

    11125 (MCL 324.11103, 324.11118, 324.11118a, 324.11120,                     

                                                                                

    324.11123, and 324.11125), section 11118a as added by 1996 PA 182           

                                                                                

    and section 11120 as amended by 1995 PA 61.                                 

                                                                                

                THE PEOPLE OF THE STATE OF MICHIGAN ENACT:                      

                                                                                

1       Sec. 11103.  (1) "Generation" means the act or process of                   

                                                                                

2   producing hazardous waste.                                                  

                                                                                

3       (2) "Generator" means any person, by site, whose act or                     

                                                                                

4   process produces hazardous waste as identified or listed pursuant           

                                                                                

5   to section 11128 or whose act first causes a hazardous waste to             

                                                                                

6   become subject to regulation under this part.                               

                                                                                

7       (3) "Hazardous waste" means waste or a combination of waste                 

                                                                                

8   and other discarded material including solid, liquid, semisolid,            

                                                                                


                                                                                

1   or contained gaseous material that because of its quantity,                 

                                                                                

2   quality, concentration, or physical, chemical, or infectious                

                                                                                

3   characteristics may cause or significantly contribute to an                 

                                                                                

4   increase in mortality or an increase in serious irreversible                

                                                                                

5   illness or serious incapacitating but reversible illness, or may            

                                                                                

6   pose a substantial present or potential hazard to human health or           

                                                                                

7   the environment if improperly treated, stored, transported,                 

                                                                                

8   disposed of, or otherwise managed.  Hazardous waste does not                

                                                                                

9   include material that is solid or dissolved material in domestic            

                                                                                

10  sewage discharge, solid or dissolved material in an irrigation              

                                                                                

11  return flow discharge, industrial discharge that is a point                 

                                                                                

12  source subject to permits under section 402 of title IV of the              

                                                                                

13  federal water pollution control act, chapter 758, 86 Stat. 880,             

                                                                                

14  33 U.S.C. 1342, or is a source, special nuclear, or by-product              

                                                                                

15  material as defined by the atomic energy act of 1954, chapter               

                                                                                

16  1073, 68 Stat. 919.                                                         

                                                                                

17      (4) "Hazardous waste management" means the systematic control               

                                                                                

18  of the collection, source separation, storage, transportation,              

                                                                                

19  processing, treatment, recovery, recycling, and disposal of                 

                                                                                

20  hazardous waste.                                                            

                                                                                

21      (5) "Landfill" means a disposal facility or part of a                       

                                                                                

22  facility where hazardous waste is placed in or on land and which            

                                                                                

23  is not a pile, a land treatment facility, a surface impoundment,            

                                                                                

24  an injection well, a salt dome formation, a salt bed formation,             

                                                                                

25  or an underground mine or cave.                                             

                                                                                

26      (6) "Land treatment facility" means a treatment facility or                 

                                                                                

27  part of a treatment facility at which hazardous waste is applied            


                                                                                

1   onto or incorporated into the soil surface.  If waste will remain           

                                                                                

2   after closure, a facility described in this subsection is a                 

                                                                                

3   disposal facility.                                                          

                                                                                

4       (7) "Limited storage facility" means a storage facility that                

                                                                                

5   meets all of the following conditions:                                      

                                                                                

6       (a) Has a maximum storage capacity that does not exceed                     

                                                                                

7   25,000 gallons of hazardous waste.                                          

                                                                                

8       (b) Storage occurs only in tanks or containers.                             

                                                                                

9       (c) Has not more than 200 containers on site that have a                    

                                                                                

10  capacity of 55 gallons or less.                                             

                                                                                

11      (d) Does not store hazardous waste on site for more than                    

                                                                                

12  90 days.                                                                    

                                                                                

13      (e) Does not receive hazardous waste from a treatment,                      

                                                                                

14  storage, or disposal facility.                                              

                                                                                

15      (8) "Manifest" means a form approved by the department used                 

                                                                                

16  for identifying the quantity, composition, origin, routing, and             

                                                                                

17  destination of hazardous waste during its transportation from the           

                                                                                

18  point of generation to the point of disposal, treatment, or                 

                                                                                

19  storage.                                                                    

                                                                                

20      (9) "Manifest system" means the system used for identifying                 

                                                                                

21  the quantity, composition, origin, routing, and destination of              

                                                                                

22  hazardous waste during its transportation from the point of                 

                                                                                

23  generation to the point of disposal, treatment, or storage.                 

                                                                                

24      (10) "Mechanism" means a letter of credit, a financial test                 

                                                                                

25  that demonstrates the financial strength of the company owning a            

                                                                                

26  treatment, storage, or disposal facility or a parent company                

                                                                                

27  guaranteeing financial assurance for a subsidiary, or an                    


                                                                                

1   insurance policy that will provide funds for closure or                     

                                                                                

2   postclosure care of a treatment, storage, or disposal facility.             

                                                                                

3       (11) "Multisource commercial hazardous waste disposal well"                 

                                                                                

4   has the meaning ascribed to that term in section 62501.                     

                                                                                

5       (12)  (11)  "Municipal solid waste incinerator" means an                    

                                                                                

6   incinerator that is owned or operated by any person, and that               

                                                                                

7   meets all of the following requirements:                                    

                                                                                

8       (a) The incinerator receives solid waste from off site and                  

                                                                                

9   burns only household waste from single and multiple dwellings,              

                                                                                

10  hotels, motels, and other residential sources, or burns this                

                                                                                

11  household waste together with solid waste from commercial,                  

                                                                                

12  institutional, municipal, county, or industrial sources that, if            

                                                                                

13  disposed of, would not be required to be placed in a disposal               

                                                                                

14  facility licensed under this part.                                          

                                                                                

15      (b) The incinerator has established contractual requirements                

                                                                                

16  or other notification or inspection procedures sufficient to                

                                                                                

17  assure that the incinerator receives and burns only waste                   

                                                                                

18  referred to in subdivision (a).                                             

                                                                                

19      (c) The incinerator meets the requirements of this part and                 

                                                                                

20  the rules promulgated under this part.                                      

                                                                                

21      (d) The incinerator is not an industrial furnace as defined                 

                                                                                

22  in 40 C.F.R. 260.10.                                                        

                                                                                

23      (13)  (12)  "Municipal solid waste incinerator ash" means the               

                                                                                

24  substances remaining after combustion in a municipal solid waste            

                                                                                

25  incinerator.                                                                

                                                                                

26      (14)  (13)  "Municipality" means a city, village, township,                 

                                                                                

27  or Indian tribe.                                                            


                                                                                

1       (15)  (14)  "On site" means on the same or geographically                   

                                                                                

2   contiguous property that may be divided by a public or private              

                                                                                

3   right-of-way if the entrance and exit between the pieces of                 

                                                                                

4   property are at a crossroads intersection and access is by                  

                                                                                

5   crossing rather than going along the right-of-way.  On site                 

                                                                                

6   property includes noncontiguous pieces of property owned by the             

                                                                                

7   same person but connected by a right-of-way that the owner                  

                                                                                

8   controls and to which the public does not have access.                      

                                                                                

9       Sec. 11118.  (1) Except as otherwise provided in                            

                                                                                

10  section 11122, a person shall not establish a treatment, storage,           

                                                                                

11  or disposal facility without a construction permit from the                 

                                                                                

12  department.  A person proposing the establishment of a treatment,           

                                                                                

13  storage, or disposal facility subject to the construction permit            

                                                                                

14  requirement of this part, but not including a limited storage               

                                                                                

15  facility, shall  make application  apply for a construction                 

                                                                                

16  permit to the department on a form provided by the department.              

                                                                                

17      (2) If an amendment to this part or to the rules promulgated                

                                                                                

18  under this part subjects activities lawfully being conducted at a           

                                                                                

19  treatment, storage, or disposal facility at the time the                    

                                                                                

20  amendment takes effect to the operating license requirements of             

                                                                                

21  this part solely because of the amendment, the activities carried           

                                                                                

22  out at the facility prior to the effective date of the amendment            

                                                                                

23  are not subject to the construction permit requirements of this             

                                                                                

24  part, except for an expansion of the facility with respect to               

                                                                                

25  such activities beyond its original authorized design capacity or           

                                                                                

26  beyond the area specified in an original permit, license, or                

                                                                                

27  other authorization or an alteration of the method of hazardous             


                                                                                

1   waste treatment or disposal.                                                

                                                                                

2       (3) The application for a construction permit shall contain                 

                                                                                

3   the name and residence of the applicant, the location of the                

                                                                                

4   proposed treatment, storage, or disposal facility, and other                

                                                                                

5   information specified in this section, by rule, or by federal               

                                                                                

6   regulation issued under the solid waste disposal act.  The                  

                                                                                

7   application shall be accompanied by a construction permit                   

                                                                                

8   application fee.  The fee shall be calculated as provided in                

                                                                                

9   subsection (10) or may be based on the actual cost of the                   

                                                                                

10  construction permit review according to procedures established by           

                                                                                

11  rule.  Construction permit application fees shall be deposited in           

                                                                                

12  the general fund of the state.  The application shall include a             

                                                                                

13  copy of the actual published notice as described in subsection              

                                                                                

14  (9) and a determination of existing hydrogeological                         

                                                                                

15  characteristics specified in a hydrogeological report and                   

                                                                                

16  monitoring program consistent with rules promulgated  pursuant              

                                                                                

17  to  under this part, an environmental assessment, an engineering            

                                                                                

18  plan, and the procedures for closure and postclosure monitoring.            

                                                                                

19  The environmental assessment shall include, at a minimum, an                

                                                                                

20  evaluation of the proposed facility's impact on the air, water,             

                                                                                

21  and other natural resources of the state, and also shall contain            

                                                                                

22  an environmental failure mode assessment.                                   

                                                                                

23      (4) Except as otherwise provided in this subsection, the                    

                                                                                

24  construction permit application shall include a disclosure                  

                                                                                

25  statement that includes all of the following:                               

                                                                                

26      (a) The full name and business address of all of the                        

                                                                                

27  following:                                                                  


                                                                                

1                                                                                (i) The applicant.                                                                  

                                                                                

2       (ii) The 5 persons holding the largest shares of the equity                  

                                                                                

3   in or debt liability of the proposed facility.  The department              

                                                                                

4   may waive all or any portion of this requirement for an applicant           

                                                                                

5   that is a corporation with publicly traded stock.                           

                                                                                

6       (iii) The operator, if known.                                                

                                                                                

7       (iv) If known, the 3 employees of the operator who will have                 

                                                                                

8   the most responsibility for the day-to-day operation of the                 

                                                                                

9   facility.                                                                   

                                                                                

10      (v) Any other business entity included within the definition                

                                                                                

11  of person that any person required to be listed in subparagraphs            

                                                                                

12  (i) to (iv) has at any time had 25% or more of the equity in or              

                                                                                

13  debt liability of.  The department may waive all or any portion             

                                                                                

14  of this requirement for an applicant that is a corporation with             

                                                                                

15  publicly traded stock.                                                      

                                                                                

16      (b) All convictions for criminal violations of any                          

                                                                                

17  environmental statute enacted by a federal, state, Canadian, or             

                                                                                

18  Canadian provincial agency for each person required to be listed            

                                                                                

19  under this subsection.  If debt liability is held by a chartered            

                                                                                

20  lending institution, information required in this  subsection and           

                                                                                

21  subsection (4)(c)  subdivision and subdivisions (c) and (d) is              

                                                                                

22  not required from that institution.                                         

                                                                                

23      (c) A listing of all environmental permits or licenses issued               

                                                                                

24  by a federal, state, Canadian, or Canadian provincial agency held           

                                                                                

25  by each person required to be listed under this subsection that             

                                                                                

26  were permanently revoked because of noncompliance.                          

                                                                                

27      (d) A listing of all activities at property owned or operated               


                                                                                

1   by each person required to be listed under this subsection that             

                                                                                

2   resulted in a threat or potential threat to the environment and             

                                                                                

3   for which public funds were used to finance an activity to                  

                                                                                

4   mitigate the threat or potential threat to the environment,                 

                                                                                

5   except if the public funds expended to facilitate the mitigation            

                                                                                

6   of environmental contamination were voluntarily and expeditiously           

                                                                                

7   recovered from the applicant or other listed person without                 

                                                                                

8   litigation.                                                                 

                                                                                

9       (5) If any information required to be included in the                       

                                                                                

10  disclosure statement changes or is supplemented after the filing            

                                                                                

11  of the statement, the applicant, permittee, or licensee shall               

                                                                                

12  provide that information to the department in writing within 30             

                                                                                

13  days of the change or addition.                                             

                                                                                

14      (6) Notwithstanding any other provision of law, the                         

                                                                                

15  department may deny an application for a construction permit if             

                                                                                

16  there are any listings pursuant to subsection (4)(b), (c), or (d)           

                                                                                

17  as originally disclosed or as supplemented.                                 

                                                                                

18      (7) A person may indicate an interest in being placed on a                  

                                                                                

19  department organized mailing list to be kept informed of any                

                                                                                

20  rules, plans, construction permit applications, contested case              

                                                                                

21  hearings, public hearings, or other information or procedures               

                                                                                

22  relating to the administration of this part.  A charge may be               

                                                                                

23  required by the department to cover the cost of the materials.              

                                                                                

24      (8) There is created within the state treasury a revolving                  

                                                                                

25  fund.  When a site construction permit application is referred to           

                                                                                

26  a site review board by the department, the applicant shall pay a            

                                                                                

27  $25,000.00  $50,000.00 fee to be placed in this fund.  The                 


                                                                                

1   $25,000.00  $50,000.00 fee shall be in addition to the                     

                                                                                

2   application fee required under subsection (3).   This  The fund             

                                                                                

3   shall cover the expenses of the site review board members, the              

                                                                                

4   chairperson, a mediator, and any other expenses necessary to the            

                                                                                

5   deliberations of the board.  Up to $10,000.00 of this fund may be           

                                                                                

6   used to reimburse the municipality in which the treatment,                  

                                                                                

7   storage, or disposal facility is located for expenses to conduct            

                                                                                

8   an expert review, critique, and study of the technical                      

                                                                                

9   information relevant to the application, but this fund shall not            

                                                                                

10  be used to pay for legal fees to oppose the facility. The                   

                                                                                

11  department shall administer the fund and authorize expenditures.            

                                                                                

12  The department shall maintain records to support any expenses               

                                                                                

13  charged to the fund.  If expenses payable from the fund exceed              

                                                                                

14  the  $25,000.00  $50,000.00 fee paid by the applicant, the                  

                                                                                

15  additional expenses shall be paid from money appropriated by the            

                                                                                

16  legislature to the  revolving  fund.  created in this                       

                                                                                

17  subsection.  Any unexpended portion of an applicant's                       

                                                                                

18  $25,000.00  $50,000.00 fee that is not expended to pay the                 

                                                                                

19  expenses listed in this subsection shall be reimbursed to the               

                                                                                

20  applicant after the site review board process is concluded.                 

                                                                                

21      (9) An application for a site construction permit  shall  is                

                                                                                

22  not  be  complete unless it includes a copy of a newspaper notice           

                                                                                

23  which  that the applicant published at least 30 days prior to              

                                                                                

24  submittal of the application in a newspaper having major                    

                                                                                

25  circulation in the municipality and the immediate vicinity of the           

                                                                                

26  proposed treatment, storage, or disposal facility.  The required            

                                                                                

27  published notice shall contain a map indicating the location of             


                                                                                

1   the proposed treatment, storage, or disposal facility and                   

                                                                                

2   information on the nature and size of the proposed facility.  In            

                                                                                

3   addition, the notice shall contain all of the following                     

                                                                                

4   information provided by the department:                                     

                                                                                

5       (a) A description of the application review process.                        

                                                                                

6       (b) The location where the complete application package may                 

                                                                                

7   be reviewed.                                                                

                                                                                

8       (c) An explanation of how copies of the complete application                

                                                                                

9   package may be obtained.                                                    

                                                                                

10      (10) An applicant for a construction permit for a treatment,                

                                                                                

11  storage, or disposal facility shall calculate the applicable                

                                                                                

12  construction permit application fee required under subsection (3)           

                                                                                

13  by totaling the following for each construction permit                      

                                                                                

14  application:                                                                

                                                                                

15       (a) For a landfill, surface impoundment, land                          

                                                                                

16  treatment, or waste pile facility.......................$9,000.00           

                                                                                

17       (b) For an incinerator or treatment facility other                     

                                                                                

18  than a treatment facility in subdivision (a)............$7,200.00           

                                                                                

19       (c) For a storage facility, other than storage that                    

                                                                                

20  is associated with treatment or disposal activities that                    

                                                                                

21  may be regulated under a single permit..................$  500.00           

                                                                                

22      (d) For the permitted site size of a landfill, surface                      

                                                                                

23  impoundment, land treatment, or waste pile facility, except waste           

                                                                                

24  piles meeting the requirements of 40 C.F.R. 264.250(c), the                 

                                                                                

25  following:                                                                  

                                                                                

26       (i) Less than 5 acres............................... $100.00           

                                                                                

27       (ii) 5 to 19 acres.................................. $170.00            


                                                                                

1        (iii) 20 to 79 acres................................ $240.00            

                                                                                

2        (iv) 80 acres or more............................... $320.00            

                                                                                

3       (e) For the permitted site size of a treatment or storage                   

                                                                                

4   facility, other than a facility listed in subdivision (d), the              

                                                                                

5   following:                                                                  

                                                                                

6        (i) Less than 5 acres............................... $ 50.00           

                                                                                

7        (ii) 5 to 19 acres.................................. $100.00            

                                                                                

8        (iii) 20 to 79 acres................................ $100.00            

                                                                                

9        (iv) 80 acres or more............................... $100.00            

                                                                                

10      (f) For the projected waste volume per day for a landfill,                  

                                                                                

11  surface impoundment, land treatment, or waste pile facility,                

                                                                                

12  except waste piles meeting the requirements of 40                           

                                                                                

13  C.F.R. 264.250(c), the following:                                           

                                                                                

14       (i) Less than 50 cubic yards or 10,000 gallons...... $ 60.00           

                                                                                

15       (ii) 50 to 100 cubic yards or 10,000 to 20,000                          

                                                                                

16  gallons.................................................. $ 80.00           

                                                                                

17       (iii) 101 to 700 cubic yards or 20,001 to 140,000                       

                                                                                

18  gallons.................................................. $100.00           

                                                                                

19       (iv) More than 700 cubic yards or more than 140,000                     

                                                                                

20  gallons.................................................. $130.00           

                                                                                

21      (g) For the projected waste volume per day for a treatment or               

                                                                                

22  storage facility, other than a facility listed in                           

                                                                                

23  subdivision (f), the following:                                             

                                                                                

24       (i) Less than 50 cubic yards or 10,000 gallons...... $ 50.00           

                                                                                

25       (ii) 50 to 100 cubic yards or 10,000 to 20,000                          

                                                                                

26  gallons.................................................. $100.00           

                                                                                

27       (iii) 101 to 700 cubic yards or 20,001 to 140,000                       


                                                                                

1   gallons.................................................. $100.00           

                                                                                

2        (iv) More than 700 cubic yards or more than 140,000                     

                                                                                

3   gallons.................................................. $150.00           

                                                                                

4       (h) For the hydrogeological characteristics of a landfill,                  

                                                                                

5   surface impoundment, land treatment, or waste pile facility,                

                                                                                

6   except waste piles meeting the requirements of 40                           

                                                                                

7   C.F.R. 264.250(c), the following:                                           

                                                                                

8        (i) Natural clay.................................... $ 40.00           

                                                                                

9        (ii) Natural sand................................... $ 60.00            

                                                                                

10       (iii) Compacted clay................................ $ 70.00            

                                                                                

11       (iv) Artificially lined (other materials)........... $100.00            

                                                                                

12       (v) Any combination of the above.................... $100.00           

                                                                                

13       (i) For the hydrogeological characteristics of                         

                                                                                

14  surface water in a treatment or storage facility, other                     

                                                                                

15  than a facility listed in subdivision (h)................ $ 75.00           

                                                                                

16      Sec. 11118a.   (1) As used in this section, "multisource                    

                                                                                

17  commercial hazardous waste disposal well" has the meaning                   

                                                                                

18  ascribed to that term in section 62506a.  (2)  A multisource                

                                                                                

19  commercial hazardous waste disposal well shall maintain on site a           

                                                                                

20  treatment facility and a storage facility that have obtained a              

                                                                                

21  construction permit under section 11118 and an operating license            

                                                                                

22  under section 11123.                                                        

                                                                                

23      Sec. 11120.  (1) The department shall notify those members                  

                                                                                

24  appointed by the governor who will serve on the board within 75             

                                                                                

25  days after receipt of a construction permit application, if the             

                                                                                

26  department has not notified the applicant of the intent to deny             

                                                                                

27  the application, or at the time the department refers an                    


                                                                                

1   application to the board, or at the time an application is                  

                                                                                

2   automatically referred to the board pursuant to section 11119(4),           

                                                                                

3   whichever is earlier.  At that time the department also shall               

                                                                                

4   notify the county and the municipality in which the proposed                

                                                                                

5   treatment, storage, or disposal facility is to be located and               

                                                                                

6   request the appointment of the members of the board as provided             

                                                                                

7   in section 11117(2)(b).  The notification shall include a notice            

                                                                                

8   of intent to issue all departmental permits required for the                

                                                                                

9   construction, pending recommendations of the board and approval             

                                                                                

10  by the department.  Within 45 days after the notification, the              

                                                                                

11  county and the municipality shall select the members to serve on            

                                                                                

12  the board.  The board shall be created at that time and                     

                                                                                

13  notification of the creation of the board shall be made to the              

                                                                                

14  chairperson.                                                                

                                                                                

15      (2) Within 30 days after creation of a board, the board shall               

                                                                                

16  meet to review and establish a timetable for the consideration of           

                                                                                

17  an application for a proposed treatment, storage, or disposal               

                                                                                

18  facility.                                                                   

                                                                                

19      (3) The board shall do all of the following:                                

                                                                                

20      (a) Set a date and arrange for publication of notice of a                   

                                                                                

21  public hearing in a newspaper having major circulation in the               

                                                                                

22  vicinity of the proposed site, at its first meeting.  The public            

                                                                                

23  notice shall do both of the following:                                      

                                                                                

24                                                                               (i) Contain a map indicating the location of the proposed                           

                                                                                

25  treatment, storage, or disposal facility, a description of the              

                                                                                

26  proposed action, and the location where the application for a               

                                                                                

27  construction permit may be reviewed and where copies may be                 


                                                                                

1   obtained.                                                                   

                                                                                

2       (ii) Identify the time, place, and location for the public                   

                                                                                

3   hearing held to receive public comment and input on the                     

                                                                                

4   application for a construction permit.                                      

                                                                                

5       (b) Hold a public hearing within 45 days of the first board                 

                                                                                

6   meeting.                                                                    

                                                                                

7       (c) Publish the notice not less than 30 days before the date                

                                                                                

8   of the public hearing.                                                      

                                                                                

9       (4) Comment and input on the proposed treatment, storage, or                

                                                                                

10  disposal facility may be presented orally or in writing at the              

                                                                                

11  public hearing, and shall continue to be accepted in writing by             

                                                                                

12  the board for 15 days after the public hearing date.                        

                                                                                

13      (5) After the public hearing comment period has been closed,                

                                                                                

14  the board shall list the issues that are to be addressed through            

                                                                                

15  a negotiation process and list the issues to be evaluated by the            

                                                                                

16  board through its deliberations.                                            

                                                                                

17      (6) A negotiation process shall take place between the                      

                                                                                

18  applicant and the affected parties, who shall be identified by              

                                                                                

19  the board.  A representative of the municipality and a                      

                                                                                

20  representative of the county in which the facility is proposed to           

                                                                                

21  be located shall each be considered an affected party.  If                  

                                                                                

22  requested by any affected party or the applicant, the board shall           

                                                                                

23  appoint a mediator to assist during negotiations.  The                      

                                                                                

24  negotiation process shall:                                                  

                                                                                

25      (a) Proceed concurrently with the board's hearings process.                 

                                                                                

26      (b) Address the list of issues referred by the board and any                

                                                                                

27  other issues unanimously agreed to be considered by the applicant           


                                                                                

1   and all affected parties.                                                   

                                                                                

2       (c) Be completed within 150 days after the first meeting of                 

                                                                                

3   the board unless the applicant and 1 or more affected parties               

                                                                                

4   involved in the negotiation process jointly request an extension            

                                                                                

5   of not more than 60 days and the extension is approved by the               

                                                                                

6   board.  The board shall not grant extensions in excess of 60                

                                                                                

7   days.  An extension granted under this subdivision may extend the           

                                                                                

8   time period in which the board either approves or rejects the               

                                                                                

9   construction permit application as specified in subsection (15).            

                                                                                

10      (7) On each negotiation issue which has not reached a                       

                                                                                

11  negotiated settlement, the board shall select between final best            

                                                                                

12  offers presented by affected parties.  The final best offer or              

                                                                                

13  the negotiated settlement shall not be less stringent than the              

                                                                                

14  requirements of the law or pertinent decisions of the board,                

                                                                                

15  whichever is the most stringent.                                            

                                                                                

16      (8) The board shall conduct formal or informal hearings to                  

                                                                                

17  receive evidence on the disputed issues not subject to the                  

                                                                                

18  negotiation process described in subsections (6) and (7).                   

                                                                                

19      (9) The formal hearings process shall be conducted by the                   

                                                                                

20  board to receive information from technical experts on disputed             

                                                                                

21  issues.  Any affected party may request permission by the board             

                                                                                

22  to participate in the board's formal hearings within 15 days                

                                                                                

23  after the board's public hearing.  The board shall determine                

                                                                                

24  which affected parties shall participate in the board's formal              

                                                                                

25  hearing.  If the board denies the request of an affected party to           

                                                                                

26  participate in the board's formal hearing, the board shall give             

                                                                                

27  the affected party notice of the board's decision and the reasons           


                                                                                

1   for the decision.  A representative of the municipality and a               

                                                                                

2   representative of the county in which the facility is proposed to           

                                                                                

3   be located shall each be automatically entitled to participate.             

                                                                                

4   During the board's formal hearings process, the board shall:                

                                                                                

5       (a) Receive sworn testimony.                                                

                                                                                

6       (b) Cross-examine witnesses.                                                

                                                                                

7       (c) Allow representatives of affected parties to                            

                                                                                

8   cross-examine witnesses.                                                    

                                                                                

9       (d) Request participation as needed.                                        

                                                                                

10      (10) Comments made at informal hearings shall not be made                   

                                                                                

11  under oath and no cross-examination shall occur.                            

                                                                                

12      (11) The board shall deliberate on the impact of the proposed               

                                                                                

13  treatment, storage, or disposal facility on the municipality in             

                                                                                

14  which it is to be located,  and  how and why the location of the            

                                                                                

15  facility was selected, and whether additional treatment, storage,           

                                                                                

16  or disposal capacity is needed for the type of facility that is             

                                                                                

17  proposed.  Following its deliberations, the board shall make a              

                                                                                

18  final determination as to its recommendation to the department              

                                                                                

19  regarding the construction permit application.                              

                                                                                

20      (12) The board shall consider, at a minimum, all of the                     

                                                                                

21  following:                                                                  

                                                                                

22      (a) The risk and impact of accident during the transportation               

                                                                                

23  of hazardous waste.                                                         

                                                                                

24      (b) The risk and impact of contamination of ground and                      

                                                                                

25  surface water by leaching and runoff from the proposed treatment,           

                                                                                

26  storage, or disposal facility.                                              

                                                                                

27      (c) The risk of fires or explosions from improper treatment,                


                                                                                

1   storage, and disposal methods.                                              

                                                                                

2       (d) The impact on the municipality where the proposed                       

                                                                                

3   treatment, storage, or disposal facility is to be located in                

                                                                                

4   terms of health, safety, cost, and consistency with local                   

                                                                                

5   planning and existing development.  The board also shall consider           

                                                                                

6   local ordinances, permits, or other requirements and their                  

                                                                                

7   potential relationship to the proposed treatment, storage, or               

                                                                                

8   disposal facility.                                                          

                                                                                

9       (e) The nature of the probable environmental impact,                        

                                                                                

10  including the specification of the predictable adverse effects on           

                                                                                

11  the following:                                                              

                                                                                

12                                                                               (i) The natural environment and ecology.                                            

                                                                                

13      (ii) Public health and safety.                                               

                                                                                

14      (iii) Scenic, historic, cultural, and recreational value.                    

                                                                                

15      (iv) Water and air quality and wildlife.                                     

                                                                                

16      (f) An evaluation of measures to mitigate adverse effects.                  

                                                                                

17      (g) The treatment, storage, and disposal capacity for the                   

                                                                                

18  type of facility that is proposed.                                          

                                                                                

19      (h)  (g)  The  board shall consider the  information                        

                                                                                

20  contained in the construction permit application disclosure                 

                                                                                

21  statement.                                                                  

                                                                                

22      (i) The site selection process used by the applicant, and the               

                                                                                

23  basis for the selection of the proposed site.                               

                                                                                

24      (j) For a commercial treatment, storage, or disposal                        

                                                                                

25  facility, the need for the facility based on existing and future            

                                                                                

26  hazardous waste management capacity and needs within the state.             

                                                                                

27      (13) The board also shall consider the concerns and                         


                                                                                

1   objections submitted by the public.  The board shall facilitate             

                                                                                

2   efforts to provide that the concerns and objections are mitigated           

                                                                                

3   by establishing additional stipulations specifically applicable             

                                                                                

4   to the treatment, storage, or disposal facility and operation at            

                                                                                

5   that site.  Through deliberations, the board may modify the                 

                                                                                

6   construction permit application in response to its findings.  To            

                                                                                

7   the fullest extent practicable, the board also shall integrate by           

                                                                                

8   stipulation the provisions of the local ordinances, permits, or             

                                                                                

9   requirements.                                                               

                                                                                

10      (14) The board may seek the advice of any person in order to                

                                                                                

11  render a decision to issue its recommendation to the department             

                                                                                

12  to approve or deny the construction permit application.                     

                                                                                

13      (15) Within 180 days after the first meeting of the board,                  

                                                                                

14  the board shall make a decision on the negotiated agreement and             

                                                                                

15  the final best offer from each party on each issue and shall                

                                                                                

16  recommend to the department that the department either approve or           

                                                                                

17  reject the construction permit application.  The 180-day time               

                                                                                

18  period may be extended as provided in  subdivision  subsection              

                                                                                

19  (6)(c).  However, an extension shall not exceed 60 days.                    

                                                                                

20      (16) If the board recommends to the department the approval                 

                                                                                

21  of the construction permit application and the department follows           

                                                                                

22  the recommendation, the department shall prepare a draft                    

                                                                                

23  construction permit and initiate a public participation process             

                                                                                

24  equivalent to that required by the applicable provisions of the             

                                                                                

25  solid waste disposal act or regulations promulgated under that              

                                                                                

26  act.  Upon completion of the public participation process, the              

                                                                                

27  department shall review all comments made during that process and           


                                                                                

1   shall issue or revise and issue the construction permit or                  

                                                                                

2   reconvene the board to consider issues specified by the                     

                                                                                

3   department that were raised during the public participation                 

                                                                                

4   process.  Within 30 days after having been reconvened under this            

                                                                                

5   subsection, the board shall recommend to the department the                 

                                                                                

6   rejection of the application or recommend the revision and                  

                                                                                

7   issuance of the construction permit, or recommend that the                  

                                                                                

8   department revise the draft construction permit and initiate a              

                                                                                

9   public participation process equivalent to that required by the             

                                                                                

10  applicable provisions of the solid waste disposal act or                    

                                                                                

11  regulations promulgated under that act.                                     

                                                                                

12      (17) If the board recommends the rejection of the                           

                                                                                

13  construction permit application, the board shall do all of the              

                                                                                

14  following:                                                                  

                                                                                

15      (a) State its reasons in writing and indicate the necessary                 

                                                                                

16  changes to make the application acceptable if a new application             

                                                                                

17  is made.                                                                    

                                                                                

18      (b) Recommend that the department deny the construction                     

                                                                                

19  permit and initiate a public participation process equivalent to            

                                                                                

20  that required by the applicable provisions of the solid waste               

                                                                                

21  disposal act, or regulations promulgated under that act.                    

                                                                                

22      Sec. 11123.  (1) Unless a person is complying with                          

                                                                                

23  subsection (5) or a rule promulgated under section 11127(4), a              

                                                                                

24  person shall not conduct, manage, maintain, or operate a                    

                                                                                

25  treatment, storage, or disposal facility within this state                  

                                                                                

26  without an operating license from the department.                           

                                                                                

27      (2) The application for an operating license shall contain                  


                                                                                

1   the name and residence of the applicant, the location of the                

                                                                                

2   proposed or existing treatment, storage, or disposal facility,              

                                                                                

3   and other information considered necessary by the department                

                                                                                

4   including proof of financial responsibility.  If the treatment,             

                                                                                

5   storage, or disposal facility includes a multisource commercial             

                                                                                

6   hazardous waste disposal well, the application shall specify                

                                                                                

7   whether the applicant has received all necessary permits under              

                                                                                

8   state and federal law to operate the multisource commercial                 

                                                                                

9   hazardous waste disposal well. In addition, the application for             

                                                                                

10  the initial operating license after issuance of a construction              

                                                                                

11  permit shall contain all of the disclosure information called for           

                                                                                

12  in section 11118(4) that was not provided as part of the                    

                                                                                

13  construction permit application and any changes in or additions             

                                                                                

14  to the previously submitted disclosure information.  In addition,           

                                                                                

15  the owner and operator shall certify that the disclosure listings           

                                                                                

16  previously submitted continue to be correct.  An applicant for an           

                                                                                

17  operating license for a treatment, storage, or disposal facility            

                                                                                

18  that is a surface impoundment, landfill, or land treatment                  

                                                                                

19  facility shall demonstrate financial responsibility for claims              

                                                                                

20  arising from nonsudden and accidental occurrences relating to the           

                                                                                

21  operation of the facility that cause injury to persons or                   

                                                                                

22  property.  The application shall be accompanied by a fee of                 

                                                                                

23  $500.00.  The license fees shall be deposited in the general fund           

                                                                                

24  of the state.                                                               

                                                                                

25      (3) The applicant also shall submit to the department a                     

                                                                                

26  certification under the seal of a registered professional                   

                                                                                

27  engineer verifying that the construction of the treatment,                  


                                                                                

1   storage, or disposal facility has proceeded according to the                

                                                                                

2   plans approved by the department and, if applicable, the approved           

                                                                                

3   construction permit.  The department shall require additional               

                                                                                

4   certification periodically during the operation or in order to              

                                                                                

5   verify proper closure of the site.  The department shall require            

                                                                                

6   from those treatment, storage, or disposal facilities that are              

                                                                                

7   permitted to operate pursuant to section 11116, certification of            

                                                                                

8   the treatment, storage, or disposal facilities' capability of               

                                                                                

9   treating, storing, or disposing of hazardous waste in compliance            

                                                                                

10  with this part.                                                             

                                                                                

11      (4) The department shall establish a schedule for requiring                 

                                                                                

12  each person subject to subsection (5) to submit an operating                

                                                                                

13  license application.  The department may adjust this schedule as            

                                                                                

14  necessary.  Each person subject to subsection (5) shall submit a            

                                                                                

15  complete operating license application within 180 days of the               

                                                                                

16  date requested to do so by the department.                                  

                                                                                

17      (5) A person who owns or operates a treatment, storage, or                  

                                                                                

18  disposal facility that is in existence on the effective date of             

                                                                                

19  an amendment of this part or of a rule promulgated under this               

                                                                                

20  part that renders all or portions of the facility subject to the            

                                                                                

21  operating license requirements of this section may continue to              

                                                                                

22  operate the facility or portions of the facility that are subject           

                                                                                

23  to the operating license until an operating license application             

                                                                                

24  is approved or denied if all of the following conditions have               

                                                                                

25  been met:                                                                   

                                                                                

26      (a) A complete operating license application is submitted                   

                                                                                

27  within 180 days of the date requested by the department under               


                                                                                

1   subsection (4).                                                             

                                                                                

2       (b) The person is in compliance with all rules promulgated                  

                                                                                

3   under this part and with all other state laws.                              

                                                                                

4       (c) The person qualifies for interim status as defined in the               

                                                                                

5   solid waste disposal act, is in compliance with interim status              

                                                                                

6   standards established by federal regulation under subtitle C of             

                                                                                

7   the solid waste disposal act, title II of Public Law 89-272, 42             

                                                                                

8   U.S.C. 6921 to  6931 and 6933 to 6939b  6939e, and has not had              

                                                                                

9   interim status terminated.                                                  

                                                                                

10      Sec. 11125.  (1) The department shall provide notice and an                 

                                                                                

11  opportunity for a public hearing before making a final decision             

                                                                                

12  on an operating license application.  The department shall make a           

                                                                                

13  final decision on an operating license application within 140               

                                                                                

14  days after the department receives a complete application.                  

                                                                                

15  However, if the state's hazardous waste management program is               

                                                                                

16  authorized by the United States environmental protection agency             

                                                                                

17  under sections 3006 to 3009 of subtitle C of the solid waste                

                                                                                

18  disposal act, title II of Public Law 89-272, 42 U.S.C. 6926 to              

                                                                                

19  6929, the department may extend the deadline beyond the                     

                                                                                

20  limitation provided in this section in order to fulfill the                 

                                                                                

21  public participation requirements of the solid waste disposal               

                                                                                

22  act.  The operating license may contain stipulations specifically           

                                                                                

23  applicable to site and operation.  A local ordinance, permit, or            

                                                                                

24  other requirement shall not prohibit the operation of a licensed            

                                                                                

25  treatment, storage, or disposal facility.                                   

                                                                                

26      (2) If any information required to be included in the                       

                                                                                

27  disclosure statement required under section 11118 changes or is             


                                                                                

1   supplemented after the filing of the statement, the applicant,              

                                                                                

2   permittee, or licensee shall provide that information to the                

                                                                                

3   department in writing within 30 days of the change or addition.             

                                                                                

4       (3) The department may deny an operating license application                

                                                                                

5   submitted pursuant to section 11123 if there are any listings               

                                                                                

6   pursuant to section 11118(4)(b) to (d) that were not identified             

                                                                                

7   during the site review board process or were not disclosed as               

                                                                                

8   required in section 11123(2) or this section.                               

                                                                                

9       (4) The department shall not issue an operating license for a               

                                                                                

10  treatment, storage, or disposal facility that includes a                    

                                                                                

11  multisource commercial hazardous waste disposal well unless the             

                                                                                

12  applicant has received all other necessary permits under state              

                                                                                

13  and federal law to operate the multisource commercial hazardous             

                                                                                

14  waste disposal well.                                                        

                                                                                

15      Enacting section 1.  This amendatory act does not take                      

                                                                                

16  effect unless Senate Bill No. _____ or House Bill No. 4294                  

                                                                                

17  (request no. 01121'03) of the 92nd Legislature is enacted into              

                                                                                

18  law.